| 01 |
Structural Engineering |
Stamped structural drawings, load calculations, connection details, and material specifications. |
The design should be checked for local wind, snow, seismic, roof, and foundation loads using the applicable national or regional building code. |
Who is the licensed engineer responsible for adapting the design to the project site? |
| 02 |
Building-Code Compliance |
Code compliance statement, plan-review package, fire-safety details, and examples of approved projects. |
The supplier should identify the target jurisdiction and design against its adopted residential, energy, fire, and accessibility requirements. |
Will the package be reviewed by a local architect, engineer, or building-control authority before production? |
| 03 |
Climate and Weather Resistance |
Wind-zone calculations, snow-load design, corrosion protection, water-management details, and test reports where applicable. |
The envelope should address the actual site climate, including wind-driven rain, freeze-thaw exposure, humidity, wildfire risk, or coastal corrosion. |
Which components change when the same A-frame model is supplied for a different climate zone? |
| 04 |
Thermal Performance |
Wall and roof build-ups, insulation type and thickness, window U-values, air-sealing details, and energy calculations. |
Compare whole-envelope performance rather than insulation thickness alone; confirm condensation control and thermal-bridge treatment. |
Are the stated insulation and window values based on tested performance or theoretical material data? |
| 05 |
Materials and Component Quality |
Material grades, treatment records, product datasheets, fastener specifications, and supplier traceability. |
Timber, steel, glazing, membranes, and fixings should be clearly specified instead of described only as “premium” or “high quality.” |
Can the bill of materials be frozen before manufacture, with written approval required for substitutions? |
| 06 |
Factory Quality Control |
Inspection and test plan, dimensional checks, photographic records, nonconformance process, and quality-management documentation. |
Prefer documented in-process inspections covering framing, moisture, waterproofing, electrical work, packaging, and final dispatch. |
What inspections are completed before shipment, and can the buyer receive the inspection record? |
| 07 |
Customization and Design Flexibility |
Revision-controlled drawings, options list, structural impact assessment, and a clear change-order procedure. |
Confirm which changes are standard options and which require new engineering, such as larger openings, mezzanines, or altered roof geometry. |
How are design changes priced, approved, and reflected in the final delivery schedule? |
| 08 |
Shipping and Installation Scope |
Packing list, shipping dimensions, lifting plan, Incoterms, installation drawings, and site-preparation requirements. |
Separate factory scope, transport scope, foundation scope, utility scope, and on-site assembly scope in the quotation. |
Does the price include unloading, lifting equipment, installation supervision, weatherproofing, and commissioning? |
| 09 |
Warranty and After-Sales Support |
Written warranty, exclusions, claims process, spare-parts policy, and response-time commitments. |
The contract should distinguish structural, waterproofing, finishes, appliances, and supplied equipment warranties. |
Who handles defects in the destination country, and what evidence is required to process a warranty claim? |
| 10 |
Total Cost and Contract Transparency |
Itemized quotation, payment milestones, taxes, duties, freight assumptions, exclusions, delivery dates, and cancellation terms. |
Compare the complete delivered-and-installed cost, not only the advertised factory price. |
Which costs remain outside the quotation, and what events permit price or schedule changes? |